Skip to content
HOME
LOGIN
  • Sprung Supplied Toolkit
  • Technical Consultant
  • Foundation
    • Concrete Foundation
      • 01 Prep base area
      • 02 Engineer review
      • 03 Identify location of concrete anchors
      • 04 Install concrete anchors
      • 05 Finishing the structure
    • Earth Foundation
      • 01 Prep base area
      • 02 Engineer review
      • 03 Identify location of earth anchors
      • 04 Install earth anchors
      • 05 Proof load & test earth anchors
      • 06 Finishing the structure
    • Asphalt Foundation
      • 01 Prep base area
      • 02 Engineer review
      • 03 Identify location of earth anchors
      • 04 Install earth anchors
      • 05 Proof load & test earth anchors
      • 06 Finishing the structure
    • Ecology Block Foundation
    • Ballast Foundation
    • Container Foundation
  • Erecting the Structure
    • Manpower & Equipment Requirements
    • Layout and Assembly
      • Inventory Components and Tools
      • Move Beams Into Location
      • Splice Beams Into Arches
      • Install Base Plates and Spreader Angles
    • Erecting the Substructure
      • Raise the Tie-off Arch
      • Raise the Adjacent Arches
      • Install Spreaders
      • Temporary Anchor the Base Plates
      • Repeat as Necessary
    • Installing the Membrane Panels, Tension and Anchor
      • Install the membrane center panel
      • Vertically tension the membrane
      • Install the membrane end panel
      • Vertically tension the end panel
      • Ensure all installed membranes have been vertically tensioned
      • Prepare the spreaders for tensioning
      • Install the base cables and remove anchors
      • Cable bracing
      • Tension the membrane
      • Position and anchor the arch base
      • Repeat until completed
      • Access pockets
    • Installing the Optional Insulation Package
      • Install the insulation retaining system
      • Installing the insulation
      • Tape insulation rolls together
      • Install the interior membrane
    • Install the Options
  • Penetrating the Structure
    • Frameless Penetration Kit
    • Framed Penetrations
  • Electrical
    • Running conduit/wire
    • Attaching items to the structure
    • Insulated structures
    • Lightning protection
  • HVAC
    • Planning and preparation
    • Installing ductwork
    • Balancing the HVAC system
  • Suspension Brackets
    • 75-lb Suspension Bracket
    • 300-lb Suspension Bracket
  • Interior Buildout
    • Interior walls
    • Ceilings
    • Flooring
    • Cable trays
    • Hospital headboards
    • Athletic facilities
    • Gantry cranes
    • Kitchens
    • Mezzanines
    • Conference rooms/offices
    • Elevators and escalators
    • Restrooms
  • Logos & Graphics
  • Maintenance Manual
    • Anchoring
    • Membrane damage
    • Cleaning the membrane
    • Snow removal
    • Landscaping
    • Door maintenance
    • Interior pressure (HVAC)
    • Recommended spare parts
  • Lighting
  • Connecting Sprung to Conventional Construction
Lost your password?

Email: info@sprung.com
Toll Free: 1.855.495.1122

Sprung Instant Structures, Inc.
5711 West Dannon Way, West Jordan, Utah
USA  84081

Sprung Instant Structures Ltd.
PO Box 62, 80039 Maple Leaf Road, Aldersyde, Alberta
Canada T0L 0A0

Foundation Erecting the Structure Penetrating the Structure HVAC Electrical Suspension Brackets Interior Buildout Logos & Graphics Maintenance Manual Lighting & Security Connecting Sprung to Conventional Construction

© 2026 Sprung Contractors Guide. All Rights Reserved. | Terms & Conditions